On a roof deck that's about to be sealed in concrete for good, there's one shot to get the cable pathways right. Here's how we routed conduit through the rebar grid and staged the cable runs before the pour closed everything in.
Rough-in work on a slab has one window: before the pour. We coordinate directly with the pour schedule so every data and camera pathway is routed, tested for a clear pull, and locked into place while the deck is still open — no chasing walls or exposed conduit after the fact.
Talk to our team early so your data, camera, and network pathways are ready before the slab closes up.